Kondisi Pembangkit PLTM Endikat 29 Mei 2023
A. Kondisi Operasi Mesin
Turbine 1 = ON (24 Jam)
Turbine 2 = ON (0 – 16)
Turbine 3 = ON (0 – 8)
Maintenance
-Nihil
SPB
-Nihil
Info tambahan
Unit 3, debit air masih naik turun