Kondisi Pembangkit PLTU Baturaja 23 Juni 2023

Kondisi Operasi Mesin
STG 1 = ON 24 jam
STG 2 = ON 24 jam

Maintenance

Elektrik :
1. Check dan repair power area crusher
2. Repair trafo las team mekanik
3. Repair mic wireless sound system HSE
4. Prepare penggantian power supply PLC Crusher
Mekanik :
1. Continue potong roundbar untuk housing roller Bering roller screen crusher di coba pakai cutting torch blander
2. Pengecekan dan Repair ponton pump #1
3. Cek cover manhole bak feed control valve CWR bagian belakang cooling tower
4. Pengecekan ulang pompa SC#3
5. Daily repair & maintenance

chek dan perbaikan power di crusher ada yg short

persiapan penggantian power supply plc crusher

perbaikn mic wireless speaker HSE

perbaikan speed sensor manual rpm turbin 2

perbaikan mesin las team mekanik

Cutting round bar pakai blender Continue

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago