Kondisi Operasi Mesin
STG 1 = ON 24 jam
STG 2 = ON 24 jam
Maintenance
Elektrik :
1. Check dan repair power area crusher
2. Repair trafo las team mekanik
3. Repair mic wireless sound system HSE
4. Prepare penggantian power supply PLC Crusher
Mekanik :
1. Continue potong roundbar untuk housing roller Bering roller screen crusher di coba pakai cutting torch blander
2. Pengecekan dan Repair ponton pump #1
3. Cek cover manhole bak feed control valve CWR bagian belakang cooling tower
4. Pengecekan ulang pompa SC#3
5. Daily repair & maintenance
chek dan perbaikan power di crusher ada yg short
persiapan penggantian power supply plc crusher
perbaikn mic wireless speaker HSE
perbaikan speed sensor manual rpm turbin 2
perbaikan mesin las team mekanik
Cutting round bar pakai blender Continue
Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…
Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…
Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…
Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…
Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…
Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…