Kondisi Pembangkit PLTU Baturaja 28 Juni 2023
Kondisi Operasi Mesin
STG 1 = ON 24 jam
STG 2 = ON 24 jam
Maintenance
Elektrik :
1. Test motor rapping esp3
2. Continue daily maintenance mpb area
3. Support test trial cooling tower
4. Continue pengeringan coil motor wjt
Mekanik :
1. Kontinue pemotongan round bar
2. Kontinue pabrikasi frame tonbag buat sampah di MPB
3. Repair ruber skirt belt#2 elv #0 arah silo
4. Prepare penggantian roller bering roller screen #B
5. Lubrication auxiliary Boiler & Turbin
6. Trial cooling fan#1
7. Repair kebocoran silo mini
8. Daily repair dan maintenance
SPB
Nihil