Kondisi Operasi Mesin
STG 1 = ON 24 jam
STG 2 = ON 24 jam

Maintenance

  1. Penambahan oli cooling fan#1 akan di lakukan trial
  2. Pengecekan Auxylary boiler &turbin
  3. Repair kebocoran jalur #6 area boiler make-up
  4. Continue pemotongan rondbar
  5. Continue fabrikasi frame tonbag MPB
  6. Prepare blok Bering roller screen
  7. Kontinue repair ruber skirt belt #2 elv#0 arah silo

SPB
Nihil