Kondisi Operasi Mesin
GTG 1 = ON (24 Jam)
GTG 2 = ON (8-16)
GTG 3 = ON (24 Jam)
STG = ON (0-10)
Maintenance
Nihil
SPB
Nihil
Setting ulang CPC 505 utk mengkondisikan travel ST.

Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
GTG 1 = ON (24 Jam)
GTG 2 = ON (8-16)
GTG 3 = ON (24 Jam)
STG = ON (0-10)
Maintenance
Nihil
SPB
Nihil
Setting ulang CPC 505 utk mengkondisikan travel ST.