Kondisi Pembangkit PLTM Endikat 16 Juli 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0-19)
Turbine 2 = ON (0-19)
Turbine 3 = ON (0-12)

SPB
Nihil
Maintenance
Perbaikan HDPE spacer titik 575b ke 576

Perbaikan kabel spacer titik 611 s/d 612

Leave a Reply

Your email address will not be published. Required fields are marked *