Kondisi Operasi Mesin
Turbine 1 = ON (0-14)
Turbine 2 = ON (24 Jam)
Turbine 3 = ON (24 Jam)
SPB
Nihil
Maintenance
Pengecekkan dan pengencangan fanbelt airfan unit 2


Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-14)
Turbine 2 = ON (24 Jam)
Turbine 3 = ON (24 Jam)
SPB
Nihil
Maintenance
Pengecekkan dan pengencangan fanbelt airfan unit 2