Kondisi Pembangkit PLTM Endikat 25 Juli 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0-20)
Turbine 2 = ON (0-20)
Turbine 3 = ON (0-20)

SPB
Nihil
Maintenance
Perawatan instalasi listrik(panel pintu penguras hp2 lahat dan pagaralam)

Pengambilan sample oli

Leave a Reply

Your email address will not be published. Required fields are marked *