Kondisi Pembangkit PLTM Endikat 26 Juli 2023
Kondisi Operasi Mesin
Turbine 1 = ON (24 jam)
Turbine 2 = ON (24 jam)
Turbine 3 = ON (24 jam)
SPB
Nihil
Maintenance
Pengecekkan fibrasi unit 1,2 dan 3



Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (24 jam)
Turbine 2 = ON (24 jam)
Turbine 3 = ON (24 jam)
SPB
Nihil
Maintenance
Pengecekkan fibrasi unit 1,2 dan 3