Kondisi Pembangkit PLTM Lahat 5 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-20)
Turbine 2 = ON (0-23)
Turbine 3 = ON (0-20)
SPB
Nihil
Maintenance
Pengecekkan dan pembersihan WCS unit 1





Pemasangan ijeksi pum genset izuzu poton bendung




Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-20)
Turbine 2 = ON (0-23)
Turbine 3 = ON (0-20)
SPB
Nihil
Maintenance
Pengecekkan dan pembersihan WCS unit 1





Pemasangan ijeksi pum genset izuzu poton bendung