Kondisi Pembangkit PLTM Endikat 8 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-17)
Turbine 2 = ON (0-14)
Turbine 3 = ON (0-15)
SPB
Nihil
Maintenance
Pembersihan headpon




Pemasangan guying titik 610 dan 611





Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-17)
Turbine 2 = ON (0-14)
Turbine 3 = ON (0-15)
SPB
Nihil
Maintenance
Pembersihan headpon




Pemasangan guying titik 610 dan 611