Kondisi Pembangkit PLTM Lahat 12 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Turbine 3 = OFF
SPB
Nihil
Maintenance
Pengecekkan oli final drive exca Hitachi




Normalisasi downstream bendung


Monitoring All Power Plant Manggala