Categories: PLTU BATURAJA

Kondisi Pembangkit PLTU Baturaja 23 Agustus 2023

Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Repair cooling fan #2
  2. Repair & maintenance condensate pump turbine#1
  3. Cleaning room dan jalan area compressor FEIHE
  4. Prepare install ceramic long bow,line transfer ash silo
  5. Repair block bearing roller screen crushing
  6. Leak repair line transfer ash silo
  7. Prepare install pipeline drain ash silo mini to wet drain mixer

Elektrik

  1. koneksi power dan test motor wjt1#1
  2. continue greasing motor auxiliary
  3. abnormal genset 75kw, baterai drop
  4. Chek module panel wjt yg rusak
  5. daily maintenance

SPB
Nihil

Dismantling drive shaft dan penggantian oil seal cooling fan 2

Penarikan kabel baru kompressor baru no#2 sulair

Repair box ignition boiler#1 oleh team elektrik instrument, dan pemasangan power waterztpum, trial oleh team elektrikal langsung OK

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago