Kondisi Pembangkit PLTU Baturaja 24 Agustus 2023

Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Perawatan pompa ponton
    2.fabrikasi CWR piping ke jalur reservoar
    3.Lubricating All Gearbox
    # Oil Change gearbox coal feeder,Slug Drag,Roller Screen,Mixer,greasing gearbox rapping
    4.Prepare install ceramic long bow,line transfer ash silo
    5.Leak repair line transfer ash silo
    6.Prepare install pipeline drain ash silo mini to wet drain mixer
    7.Perawatan kompresor FEIHE
    -Cleaning cassing
    -Cleaning air filter

Elektrik

  1. Penggantian Kabel CCTV level drum Boiler 1
  2. perbaikan Sensor Temperature Variable Coupling FWP 3.
  3. Continue perbaikan ModuL Ignitions Boiler1
  4. greasing motor auxiliary
  5. charger aki diesel pump hydrant
  6. daily maintenance

SPB
Nihil

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago