Kondisi Pembangkit PLTU Baturaja 30 Agustus 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Maintenance
Mekanik
- Lubricating pillow block bearing Ring Hammer 1a dan 1b
- Repair gear box rapping ESP Bin #2 dan #3
- Repair kebocoran line transfer ash silo
- Repair spare block bearing roller screen
- Moving alat kerja ke workshop baru
- Continue modifikasi pipa pompa ponton
Elektrik
- perbaikan lighting crusher area
- conection power kontrol air dryer kompressor baru
- relokasi motor eks mixer ashsilo
- perbaikan panel lighting ashsilo
- daily maintenance
SPB
Nihil