Kondisi Pembangkit PLTU Baturaja 7 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Penambahan oil blok bearing IDF
  2. Fabrikasi tangga untuk cleaning screen ponton
  3. Perbaikan dan trial pompa ponton #1
  4. Trial gearbox rapping di workshop untuk di install di Bin #2
  5. Lanjut install pipa drain mini silo
  6. Repair kebocoran line transfer ash silo
  7. Fabrikasi rack untuk workshop baru

Elektrik

  1. continue penggantian bearing motor wjt #1
  2. support dan pengawasan optimalisasi hoist crane dcs1
  3. continue repair kontrol dust remover
  4. continue repair module power suplay acb crusher
  5. Daily maintenance

SPB
Nihil