Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Maintenance
Mekanik
- Repair kebocoran line transfer ash silo
- Repair kebocoran ducting weighing #2
- Repair V-frame carry roller B/C #2
- Repair transfer Valve vessel#3 dan # 4
- Lanjut bikin rak spare parts workshop baru
- Lanjut moving spare parts dari workshop lama
- Inspeksi Drive pulley B/C #2 dan penambahan baut cassing
- Lanjut pekerjaan pompa ponton
Elektrik
- Penggantian silica gel transformer
- pelumasan motor cooling tower, cwp dan auxiliary boiler
- continue daily transformer
- Penggantian angker gerinda elektrik