Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Repair kebocoran line transfer ash silo
  2. Repair kebocoran ducting weighing #2
  3. Repair V-frame carry roller B/C #2
  4. Repair transfer Valve vessel#3 dan # 4
  5. Lanjut bikin rak spare parts workshop baru
  6. Lanjut moving spare parts dari workshop lama
  7. Inspeksi Drive pulley B/C #2 dan penambahan baut cassing
  8. Lanjut pekerjaan pompa ponton

Elektrik

  1. Penggantian silica gel transformer
  2. pelumasan motor cooling tower, cwp dan auxiliary boiler
  3. continue daily transformer
  4. Penggantian angker gerinda elektrik
  5. support pengamanan kabel cctv team umum perbaikan dinding dcs 1