Kondisi Pembangkit PLTU Baturaja 13 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)

Maintenance
Mekanik

  1. Cleaning workshop
  2. Repair kebocoran line transfer ash silo
  3. Fabrikasi & install Skirt Rubber plough tripper B/C #3
  4. Install tirai untuk persiapan drain ash mini silo
  5. Lanjut bikin rak spare parts workshop baru (finishing/painting)
  6. Lanjut pekerjaan pompa ponton
  7. Inspeksi vessel tank#3 setelah perbaikan discharge selenoid valve

Elektrik

  1. Penggantian silica gel transformer 2
  2. continue pelumasan motor auxiliary boiler
  3. Chek sensor swas sistem
  4. daily maintenance

Leave a Reply