Kondisi Pembangkit PLTU Baturaja 16 September 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Maintenance
Mekanik
- Cleaning area workshop
- Lanjut pekerjaan pompa ponton
- Modifikasi DT Erlan u/ drain mini silo
-fabrikasi pintu belakang dan pasang terpal - Repair block bearing R/S (u/spare)
- Fabrikasi tambahan rack spare parts workshop
- Inspeksi vessel tank #3
– setting transfer valve
Elektrik
- Senam sehat sabtu
- Perawatan ruang panel valve dan control room
- Continue perbaikan dispenser dan lighting 20kv
- daily maintenance
Perawatan panel valve room