Kondisi Pembangkit PLTU Baturaja 19 September 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- 2.P.M Ring Hammer 1 A
ganti rubber ring
coupling - P.M compressor FEIHE
#2
Cleaning Air Filter
Cleaning Room - Repair kebocoran line transfer ash silo
- Repair vessel Tank 3 ESP #1
-Setting transfer valve - Cleaning & moving tools area Ponton
- Fabrikasi bak penampung kebocoran oli turbine #1
- P.M Boiler & Turbine auxiliary
Electric
- Perbaikan Lighting di area Boiler 1
- Perbaikan Modul Ignitions boiler #1
- Penggantian Potensio actuator Spare
- daily maintenance
Penggantian rubber coupling Ring Hammer #B


Penggantian potensio actuator motor spare idf



Support Oh di lahat, pengukuran exiter menggunakan alat micro ohm meter





Penambahan suport modifikasi suction pipa intake ponton #1&2