Kondisi Pembangkit PLTU Baturaja 19 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. 2.P.M Ring Hammer 1 A
    ganti rubber ring
    coupling
  3. P.M compressor FEIHE
    #2
    Cleaning Air Filter
    Cleaning Room
  4. Repair kebocoran line transfer ash silo
  5. Repair vessel Tank 3 ESP #1
    -Setting transfer valve
  6. Cleaning & moving tools area Ponton
  7. Fabrikasi bak penampung kebocoran oli turbine #1
  8. P.M Boiler & Turbine auxiliary

Electric

  1. Perbaikan Lighting di area Boiler 1
  2. Perbaikan Modul Ignitions boiler #1
  3. Penggantian Potensio actuator Spare
  4. daily maintenance

Penggantian rubber coupling Ring Hammer #B

Penggantian potensio actuator motor spare idf

Support Oh di lahat, pengukuran exiter menggunakan alat micro ohm meter

Penambahan suport modifikasi suction pipa intake ponton #1&2