Kondisi Pembangkit PLTU Baturaja 20 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Repair kebocoran line transfer ash silo
  3. P.M Compressor SULAIR
    -Inside & outside Cleaning using vacuum cleaner & Watter jet pump
    -Repair rail sliding door
  4. Inspeksi pompa Ponton
    -Penambahan baut suction flange
  5. Fabrikasi bak penampung kebocoran oli turbine #1
  6. Inspeksi vessel Tank 3 ESP #1
    -Setting transfer valve
  7. P.M Boiler auxiliary
    Inspeksi oli SAF & PAF

Elektrik

  1. Abnormal Pembacaan PM Panel Ukulele
  2. Check Wiring Belt Weighing 1
  3. Check List Breaker ACB di Gudang schneider
  4. Normalisasi Lighting Area Boiler 1.
  5. Daily Instrument Parameter.
Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago