Kondisi Pembangkit PLTU Baturaja 22 September 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Repair kebocoran line transfer ash silo
- P.M Equipment WTP
Support produksi
Inspeksi Pompa Ponton
Inspeksi Pompa Watter Pond
Inspeksi Pompa SW - Repair Transfer Valve Vessel Tank # 1
- P.M Turbine & boiler Auxiliary
- Lanjut modif mobil DT
Install pintu bak - Support Tim civil Pekerjaan di DCS 1
Welding wire mesh
Elektrik
- Test power ponton 2 pompa
- Perbaikan lighting weghing 4
- Support normalisasi hoise dcs 1
- Continue chek jalur auto belt weghing 1
- Daily maintenance