Kondisi Pembangkit PLTU Baturaja 22 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Repair kebocoran line transfer ash silo
  3. P.M Equipment WTP
    Support produksi
    Inspeksi Pompa Ponton
    Inspeksi Pompa Watter Pond
    Inspeksi Pompa SW
  4. Repair Transfer Valve Vessel Tank # 1
  5. P.M Turbine & boiler Auxiliary
  6. Lanjut modif mobil DT
    Install pintu bak
  7. Support Tim civil Pekerjaan di DCS 1
    Welding wire mesh

Elektrik

  1. Test power ponton 2 pompa
  2. Perbaikan lighting weghing 4
  3. Support normalisasi hoise dcs 1
  4. Continue chek jalur auto belt weghing 1
  5. Daily maintenance
Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago