Kondisi Pembangkit PLTU Baturaja 24 September 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Elektrik
Suport team subkon pemasangan panel wireless hoist crane DCS#1
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Elektrik
Suport team subkon pemasangan panel wireless hoist crane DCS#1