Kondisi Pembangkit PLTU Baturaja 25 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. 2.Inspeksi Roller Screen 1 A (Vibrasi tinggi)
  3. Inspeksi ESP
    Repair & Setting T/V No.2,3 dan 5
  4. PM. WTP
    Fabrikasi kerangkeng box panel COS dan panel Jansen
    Repair pintu Ponton dan pintu gerbang
    Repair pompa SC #1
    (Setting gland packing)
    Lanjut install paranet area cooling tower.
  5. PM.Boiler auxiliary

Elektrik

  1. Pernaikan panel Cos dan pemasangan led indikator ponton
  2. Continue support optimalisasi DCS
  3. Persiapan material perbaikan sapport kabel pltu ponton
  4. Daily motor auxiliary boiler