Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = OFF (0-24)
SPB
Tolong di foll-up tangga dan stick telescopic
Maintenance
- Perbaikan waterway bocor
- cleaning headpond



Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = OFF (0-24)
SPB
Tolong di foll-up tangga dan stick telescopic
Maintenance