Kondisi Pembangkit PLTM Endikat 30 September 2023
Kondisi Operasi Mesin
Turbine 1 = On ( O-6)
Turbine 2 = On ( O-18 )
Turbine 3 = On ( O-24 )
SPB
Nihil
Maintenance
Nihil
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = On ( O-6)
Turbine 2 = On ( O-18 )
Turbine 3 = On ( O-24 )
SPB
Nihil
Maintenance
Nihil