Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area work shop
- Inspeksi ESP vessel tank #4
- PM. WTP
Fabrikasi kerangkeng box panel COS dan panel Jansen
-PM.ALL PUMPS
Cleaning screen foot valve
Lanjut install paranet manhole priming reservoir - Repair kebocoran line transfer ash silo
- Fabrikasi rack spare parts logistic
- Inspeksi & Repair Weighing
pengelasan support gearbox - Perbaikan manhole economizer boiler #1 elv:14.0
Elektrik
- Chek dan perbaikan selenoid botol 4 ESP
- support oprimalisasi hoise crane DCS
- Chek Perbaikan lighting DCS MCB trip
- Chek power ponton Unbalane dan test 2 pompa