Kondisi Pembangkit PLTU Baturaja 29 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi ESP vessel tank #4
  3. PM. WTP
    Fabrikasi kerangkeng box panel COS dan panel Jansen
    -PM.ALL PUMPS
    Cleaning screen foot valve
    Lanjut install paranet manhole priming reservoir
  4. Repair kebocoran line transfer ash silo
  5. Fabrikasi rack spare parts logistic
  6. Inspeksi & Repair Weighing
    pengelasan support gearbox
  7. Perbaikan manhole economizer boiler #1 elv:14.0

Elektrik

  1. Chek dan perbaikan selenoid botol 4 ESP
  2. support oprimalisasi hoise crane DCS
  3. Chek Perbaikan lighting DCS MCB trip
  4. Chek power ponton Unbalane dan test 2 pompa
Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago