Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop dan senam pagi
  2. Inspeksi ESP vessel tank #3
    Setting transfer valve
  3. PM. WTP
    cek dosing pump chemical
  4. PM. Boiler
    flashing all H.E
  5. Repair kebocoran line transfer ash silo
  6. Inspeksi Weighing #1
  7. Support pekerjaan PT. Lumbung instalasi pipa kompressor sullair #2
    moving & erection storage tank.

Elektrik

  1. Senam jantung sehat
  2. Chek dan perbaikan kontrol botol 3 Esp
  3. perawatan panel kompressor
  4. Continue chek ac crusher
  5. daily maintenance

Moving tangki kompresor dari turbin ke area kompresor baru

perbaikan panel kontrol esp botol 3

Trial Hoist crane DCS #1 setelah perbaikan oleh team subkon, sistem break belum maksimal