Kondisi Pembangkit PLTU Baturaja 3 Oktober 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area work shop
- 2.Inspeksi ESP
- 3.Repair kebocoran line transfer ash silo
- 4.Prepaired Install Long Bow Ceramic Liner
-Jointing Ceramic Liner Pipe to Long Bow
-Install guntry Chain block - Continous Fabrikasi Rack Spare parts Logistic
- Penggantian Pompa Ponton #1
- Suport team subkon PT Lumbung finishing installation dan test pressure pipa kompresor sulair#2
Electrik
- support team vendor chek kondisi genset black start
- penggantian monitor level drum
- chek komunikasi penyulang Ccr
- continue daily maintenance
- perawatan light pump house

















Pengecekan dan inspection untuk optimalisasi genset blacsktart dan transporter PLTU oleh team vendor di dampingi team elektrik pak Edi R dan HSE K3 listrik Bapak azis