Categories: PLTU BATURAJA

Kondisi Pembangkit PLTU Baturaja 4 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi ESP
  3. Repair kebocoran line transfer ash silo
  4. Prepaired Install Long Bow Ceramic Liner
    -Jointing Ceramic Liner Pipe to Long Bow
    -Install guntry Chain block
  5. Continous Fabrikasi Rack Spare parts Logistic
  6. PM WTP
    -Rekondisi pompa ponton ( ganti bearing )
    -Perawatan SC & SW Pumps
  7. PM.Boiler
    Inspeksi All H/E
    Tambah Oli IDF
  8. PM Genset Black Start
    -Tighten oil filter

Elektrik

  1. connect kabel power kompressor sullair
  2. perbaikan lighting elv 14.5 Mpb
  3. Penarikan kabel ethernet penyulang CCR
  4. daily maintenance

SPB
Nihil

Prepare untuk penggantian longbow pipa transfer Ashilo manufacture taychun

Prepare power kompresor#2 sulair untuk commissioning

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago