Kondisi Pembangkit PLTU Baturaja 10 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi All Weighing conveyor
  3. start up compressor SULLAIR #1
  4. Install ceramic long bow
    Tie in
  5. Repair kebocoran line transfer ash silo.
  6. Rekondisi Pompa S.C # 1
  7. Perawatan pompa auxiliary WTP

Elektrik

  1. Commisioning kompresor#1 sulair bersama team maintenance
  2. Support pengecekan power kompresor saat running loading and unloading
  3. Support team mekanik repair pompa SC#1
  4. Connect power SC and trail running

SPB
Nihil

Commisioning kompresor #1 sulair kompresor#2 Off prepare maintenance 8000 jam
Running hour load kompresor#2 sampai hari ini 7431 jam

Pompa SC#1 ready & running setelah selesai repair

Instal longbow Ashilo taychun manufacture 2 line jalur velsel#3&6 finish 🙏🏻

Tagging penomoran kompresor baru sudah di pasang team QC

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago