Kondisi Operasi Mesin
Turbine 1 = On ( O – 24)
Turbine 2 = Off
Turbine 3 = Off
SPB
Nihil
Maintenance
Perbaikan ( pengelasan ) pen link track exca cat 330 D
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = On ( O – 24)
Turbine 2 = Off
Turbine 3 = Off
SPB
Nihil
Maintenance
Perbaikan ( pengelasan ) pen link track exca cat 330 D