Kondisi Pembangkit PLTM Lahat 24 Oktober 2023
Kondisi Operasi Mesin
Turbine 1 = OFF
Turbine 2 = ON (0 – 24)
Turbine 3 = Off
SPB
Nihil
Maintenance
pengencangan tapak shoe exca hitachi long arm
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = OFF
Turbine 2 = ON (0 – 24)
Turbine 3 = Off
SPB
Nihil
Maintenance
pengencangan tapak shoe exca hitachi long arm