Kondisi Pembangkit PLTM Endikat 30 Oktober 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-4)
Turbine 2 = ON (0-19)
Turbine 3 = OFF
SPB
Nihil
Maintenance|
pengecekkan rutin pipa penstock.
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-4)
Turbine 2 = ON (0-19)
Turbine 3 = OFF
SPB
Nihil
Maintenance|
pengecekkan rutin pipa penstock.