Kondisi Operasi Mesin
Turbine 1 = OFF
Turbine 2 = ON (0 – 24)
Turbine 3 = Off
SPB
Nihil
Maintenance
pengecekkan rutin pipa penstock
pengecekkan dan pengencangan flange pipa MIV unit 2
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = OFF
Turbine 2 = ON (0 – 24)
Turbine 3 = Off
SPB
Nihil
Maintenance
pengecekkan rutin pipa penstock
pengecekkan dan pengencangan flange pipa MIV unit 2