Kondisi Pembangkit PLTM Cibuni 10 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
SPB
Nihil
Maintenance
Fabrikasi penyaring sampah depan intake
Cleaning area Unit 1&2






Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
SPB
Nihil
Maintenance
Fabrikasi penyaring sampah depan intake
Cleaning area Unit 1&2