Kondisi Pembangkit PLTM Lahat 11 November 2023

Kondisi Operasi Mesin
Turbine 1 = OFF (0 – 0)
Turbine 2 = ON (0 – 24)
Turbine 3 = OFF

SPB
Nihil
Maintenance
renovasi pos satpam kantor kayu
normalisasi bendung
perbaikan instalasi listrik pada panel pintu penguras bendung

Leave a Reply

Your email address will not be published. Required fields are marked *