Kondisi Pembangkit PLTU Baturaja 10 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Repair kompresor FEIHE NO.#2 ( Indikasi bearing screw jaming )
    Dismantling All parts & Cleaning
  5. Fabrikasi doubling plate elbow Ash silo (Elbow Manganese Steel)
  6. P/M Boiler & Turbine
    Perawatan dan pengecekan H/E all
  7. P/M WTP
    penggantian frame dan plate bordes lantai wtp
    pengawalan penggalian siring rel pjka
  8. Repair bocor line transfer Ash silo.

Elektrik

  1. Perbaikan & Pabrikasi Modul PM Ex.Generator.
  2. Perawatan Panel Auxiliary Crusher & Panel Roller Screen 1b
  3. Continue pengawasan penggalian area rel
  4. Continue perbaikan motor Cwp
  5. Perbaikan grounding demin
  6. Daily maintenance

SPB
Nihil

Melakukan perawatan pompa SC dan SW

Penggantian kompresor purifire #1

pemasangan scund dan insulating kabel