Kondisi Pembangkit PLTU Baturaja 11 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Fabrikasi doubling plate elbow Ash silo (Elbow Manganese Steel)
  5. P/M Boiler & Turbin
    Melakukan perawatan H/E all
  6. P/M WTP
    Melakukan perawatan doshing pump biocide, gloukulan dan flokulan.
    Melakukan perawatan doshing pump amonia.
    Melakukan perawatan pompa diarea sampling room.
  7. Repair bocor line transfer Ash silo.
  8. Fabrikasi knalpot W/L
  9. Re instal mesin bentor

Alhamdulillah untuk pemasangan bis beton drainase PJKA dierea crossing pipa intake ponton sudah lewat, aman