Kondisi Pembangkit PLTU Baturaja 8 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- .Repair kompresor FEIHE NO.#2 ( Indikasi bearing screw jaming )
Dismantling All parts & Cleaning - Fabrikasi doubling plate elbow Ash silo (Elbow Manganese Steel)
- PM WTP
Melakukan perawatan dan pengecekan cooling fan all.
Melakukan penggantian plate bordes lantai WTP. - Repair bocor line transfer Ash silo.
- Repair bocor ducting hopper transfer R/S #1B
- Repair ESP Vessel Tank #5 ( Indikasi losses Pressure )
Repair bottom screen
Repair membrane pressure gauge
Elektrik
- Pengecekan unit AC 20 KV
- Pengecekan dan bongkar power meter STG#1 Abnormal ( rusak)
- Kontinue repair kabel power motor CWP#1
- Pengecekan kabel intake ponton dari Rumah genset samping rel kereta Api
SPB
Nihil