Kondisi Pembangkit PLTGU MUSI II 14 November 2023
Kondisi Pembangkit PLTGU MUSI II 14 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (8-16)
GTG 3 = ON (0-24)
STG = ON (0-24)
Monitoring All Power Plant Manggala
Kondisi Pembangkit PLTGU MUSI II 14 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (8-16)
GTG 3 = ON (0-24)
STG = ON (0-24)
Kondisi Pembangkit PLTM Cibuni 13 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 13 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-15)
Turbine 2 = OFF (0-0)
Turbine 3 = ON (0-24)
Kondisi Pembangkit PLTM Lahat 13 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 2)
Turbine 3 = OFF (0 – 24)
Kondisi Pembangkit PLTU Baturaja 13 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 13 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = OFF
GTG 3 = ON (0-24)
STG = ON (0-24)