Kondisi Pembangkit PLTM Endikat 15 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-11)
Turbine 2 = ON (0-11)
Turbine 3 = ON (0-17)
SPB
Nihil
Maintenance
ROW DI jaringan 33 KV SECTION 3 dan 4
pengecekkan dan perbaikan H-01 PM 5500