Kondisi Pembangkit PLTM Lahat 15 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 20)
Turbine 2 = ON (0 – 21)
Turbine 3 = ON (0 – 8)
SPB
Nihil
Maintenance
renovasi pos satpam kantor kayu
pengecekkan dan pembersihan filter WCS unit 1,2 dan 3