Kondisi Pembangkit PLTM Cibuni 19 November 2023
Kondisi Pembangkit PLTM Cibuni 19 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
Monitoring All Power Plant Manggala
Kondisi Pembangkit PLTM Cibuni 19 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 19 November 2023
Kondisi Operasi Mesin
Turbine 1 = OFF
Turbine 2 = OFF
Turbine 3 = OFF
Kondisi Pembangkit PLTM Lahat 19 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTU Baturaja 19 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 19 November 2023
Kondisi Operasi Mesin
GTG 1 = OFF (0-9)
GTG 2 = ON (10-24)
GTG 3 = ON (0-24)
STG = ON (0-24)
Kondisi Pembangkit PLTM Cibuni 18 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 18 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-23)
Turbine 2 = ON (0-16)
Turbine 3 = ON (0-23)
Kondisi Pembangkit PLTM Lahat 18 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTU Baturaja 18 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 18 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = OFF (8-16)
GTG 3 = ON (0-24)
STG = ON (0-24)