Kondisi Pembangkit PLTM Lahat 16 November 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 23)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 18)

SPB
Nihil
Maintenance
renovasi pos satpam kantor kayu
penggantian lampu pju headpon dan bendung
pengecekkan dan perbaikan genset bendung

Leave a Reply

Your email address will not be published. Required fields are marked *