Kondisi Pembangkit PLTU Baturaja 17 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning day area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
    P/M WTP
    Melakukan pengecekan dan perawatan pompa biocide, koagulan Dan flokulan.
    Finishing Fabrikasi tools box WTP.
  4. Perawatan pompa SC dan SW
  5. Repair kebocoran line transfer ash silo
  6. Repair Mixer Wet Drain Main Silo.
    Fabrikasi safety guard pulley belt
  7. Prepair repair screen R/H
  8. inspection Filter Hollow fiber ultrafiltration UF #B

Elektrik

  1. Greasing motor Cwp
  2. Daily chek dan perawatan grounding Mpb area
  3. Pabrikasi alat kalibrasi weghing
  4. Daily sensor transmitter Boiler

Inspection UF filtra

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago