Kondisi Pembangkit PLTU Baturaja 20 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- P/M WTP
Melakukan perbaikan HP pump R/O #1 B.
Melakukan perawatan CWP.
Melakukan perawatan dan pengecekan pompa SC dan SW - P/M B/C #1 A
Ganti return roller area C/F - Repair B/C #3
Setting rubber skirt hole bungker 4 no.7 - Ganti Elbow ceramik to elbow doubling plate line transfer ash silo area belakang kompressor lama
Jalur #3 & #6 jumlah elbow 4 set
Elektrik
- Suport team PLN perbaikan jalur harpa depan Pos PLTU
- Suport team mekanik perbaikan HP Pump Rao#1B
- Perbaikan gronding SAF & PAF
- Lubrication Motor CWP, SAF & PAF
- Finishing Fabrication kalibrator weighing
- Inspection area grounding crusher
SPB
Nihil