Kondisi Pembangkit PLTU Baturaja 20 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. P/M WTP
    Melakukan perbaikan HP pump R/O #1 B.
    Melakukan perawatan CWP.
    Melakukan perawatan dan pengecekan pompa SC dan SW
  5. P/M B/C #1 A
    Ganti return roller area C/F
  6. Repair B/C #3
    Setting rubber skirt hole bungker 4 no.7
  7. Ganti Elbow ceramik to elbow doubling plate line transfer ash silo area belakang kompressor lama
    Jalur #3 & #6 jumlah elbow 4 set

Elektrik

  1. Suport team PLN perbaikan jalur harpa depan Pos PLTU
  2. Suport team mekanik perbaikan HP Pump Rao#1B
  3. Perbaikan gronding SAF & PAF
  4. Lubrication Motor CWP, SAF & PAF
  5. Finishing Fabrication kalibrator weighing
  6. Inspection area grounding crusher

SPB
Nihil