Kondisi Pembangkit PLTU Baturaja 20 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. P/M WTP
    Melakukan perbaikan HP pump R/O #1 B.
    Melakukan perawatan CWP.
    Melakukan perawatan dan pengecekan pompa SC dan SW
  5. P/M B/C #1 A
    Ganti return roller area C/F
  6. Repair B/C #3
    Setting rubber skirt hole bungker 4 no.7
  7. Ganti Elbow ceramik to elbow doubling plate line transfer ash silo area belakang kompressor lama
    Jalur #3 & #6 jumlah elbow 4 set

Elektrik

  1. Suport team PLN perbaikan jalur harpa depan Pos PLTU
  2. Suport team mekanik perbaikan HP Pump Rao#1B
  3. Perbaikan gronding SAF & PAF
  4. Lubrication Motor CWP, SAF & PAF
  5. Finishing Fabrication kalibrator weighing
  6. Inspection area grounding crusher

SPB
Nihil

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago